Projects

PFB 24 i Sv. Mateja 4, Lički Osik

Popa Frana Biničkog 24 i Sv. Mateja 4

Street

Popa Frana Biničkog 24, Sv. Mateja 4

Town

Lički Osik

Year of renovation

January, 2024.

Performed works

  • Energy restoration of building
  • Roof renovation
  • Woodwork replacement

Open gallery
Poljička 23,25,27 i 29 te A.B. Šimića 22 i 24

Poljička 23,25,27 i 29 te A.B. Šimića 22 i 24

Street

Poljička i A.B. Šimića

Town

Split

Year of construction

1984./1985.

Year of renovation

2023./2024.

Achieved energy savings

898.131,03 kWh

Reduction of CO2 emissions

151,7 t/year

Performed works

  • Improvement of outer walls of building
  • Energy efficiency improvement
  • Implementation of mineral wool and acrylic plaster as the final layer (thinlayer ETICS sistem)
  • Roof renovation (thermo, TPO foil, screed, ceramic tiles)

Open gallery
Popa Frana Biničkog, Lički Osik

Popa Frana Biničkog

Street

Popa Frana Biničkog 32

Town

Lički Osik

Year of renovation

December 2023.

Performed works

  • Energy restoration of building
  • Roof renovation
  • Woodwork replacement

Open gallery
Prilaz knezova Kurjakovića, Obrovac

Prilaz knezova Kurjakovića

Street

Prilaz knezova Kurjakovića

Town

Obrovac

Year of renovation

July 2024.

Performed works

  • Energy restoration of building
  • Roof renovation
  • Woodwork replacement

Open gallery
Hotel Diplomat Zagreb

Hotel Diplomat Zagreb

Street

Horvatova ul. 35B

Town

Zagreb

Achieved energy savings

869.084 kWh/per year or 74.89%

Reduction of CO2 emissions

282,07 t/year

Performed works

  • Work in progress
  • Preparatory works and scaffolding
  • Concrete work
  • Improving the existing heating, cooling, and ventilation system with a heat pump
  • Solar collectors for DHW production
  • Renovation of part of the envelope of the heated space of the building

Open gallery
City Side Residence

City Side Residence

Town

Split

Year of construction

2021.-2022.

Performed works

  • Works in progress
  • For more information visit our website

Open gallery
SZ Sinj

SZ Sinj

Street

Put Piketa

Town

Sinj

Year of construction

2021.

Performed works

  • Installation of Layher Blitz scaffolding
  • Installation of the Facade systems ETICS (d=10cm)
  • Installation of finishing PVC profile with mesh (APU)
  • Installation of water drip PVC profiles
  • Supply of materials and application of deep nano impregnation on all concrete surfaces

Open gallery
Projekt Gruž

Projekt Gruž

Street

Ante Starčevića 2

Town

Dubrovnik

Year of construction

2021.

Performed works

  • Installation of the Facade systems ETICS (d=10cm)
  • Installation of finishing PVC profile with mesh (APU) on the joinery
  • Installation of water drip PVC profiles at drip points
  • Installation of external RAL waterproofing tape on joinery

Open gallery
Osnovna škola Ivo Kozarčanin

Osnovna škola Ivo Kozarčanin

Street

Tomislava Bogića 2

Town

Hrvatska Dubica

Year of construction

2019.

Achieved energy savings

113.313,00 kWh/per year or 52,2%

Reduction of CO2 emissions

98,72 t/year

Performed works

  • Excavations and landscaping
  • Installation of the Facade systems ETICS with mineral wool slabs (d=14 cm), final decorative plaster
  • Waterproofing of the flat roof with TPO roof membrane
  • Installation of PVC joinery (RAL assembly)
  • Reconstruction of the heating system – supply and installation of new radiators and accompanying equipment
  • Installation of photovoltaic power station (connected power: 19.61 kW; expected annual production: 19,900 kW; A = 121.12 m2)

Open gallery
Dubrovačka 2

Dubrovačka 2

Street

Dubrovačka 2

Town

Rijeka

Year of construction

1974.

Achieved energy savings

602,973.80 kWh/per year or 55.50%

Reduction of CO2 emissions

159,97 t/year

Performed works

  • Installation of the Facade systems ETICS
  • Installation of a steel wheelchair ramp with a handle
  • Construction of a reinforced concrete slab
  • Installation of thermal insulation on a flat roof
  • Construction of horizontal waterproofing with a vapor barrier

Open gallery